Shenzhen Puwei Machinery Equipment Co., Ltd.
Contact: Miss Huang
Mobile phone: 13302984520
Domestic Sales Department: Mr. Su
Phone: 13631536081
Fax: 0755-23350160
Email: sherry@pw-chiller.com
Headquarters production base: No. 3, Fugong 1st Road, Futian Industrial Zone, Dingnan County, Ganzhou City, Jiangxi Province
For any screw chiller, if there is a water cut during use, the problem is more dangerous. At this time, it should be dealt with in a timely and effective manner. Under normal working conditions, the heat dissipation of the screw chiller is all Relying on the cooling water tower to take away the hot air from the water source, if there is no water source suddenly provided during work, then a large amount of heat will not be volatilized in time, causing the temperature of the machine to rise rapidly. When the temperature reaches a certain high temperature, it will protect itself by shutting down. When there is a water cut, the unit will usually stop running automatically in about a minute. The screw chiller will stop running to protect the core components when it is designed. the goal of.
When such a situation occurs, the screw chiller should be inspected in time. The lack of water supply is mostly caused by the lack of water in the water tower or the problem of the water pump. At this time, it is necessary to conduct a comprehensive inspection of the equipment, eliminate the failure of the water pump in time, and conduct a comprehensive test at the same time. Ensure that the water pump resumes normal operation before the screw chiller can be turned on normally.